Selected projects
Installation of the biomass-fired 3 MW hot-water boiler, design and construction of the power distribution cabinet for the boiler room, construction of electrical installations and power distribution cabinets in 5 heating stations...
Reconstruction of the existing steam boiler room as part of the project “Energy renovation of the Dr. Tomislav Bardek Hospital in Koprivnica”. Design and construction of power distribution cabinets for controlling the boiler room’s steam...
Construction of the biomass-fired boiler room for technological production purposes, installation of the high-pressure biomass-fired steam boiler with 5 t/h capacity. Design and production of power distribution cabinets for controlling...
Construction of the biomass-fired boiler room in the factory “Danica - meat industry” in Koprivnica.
Reconstruction of the boiler room and installation of a new steam boiler, production and installation of the power distribution cabinet and equipment for visualization of the steam plant with 6 t/h of process steam in the laundry service in Makarska.
Reconstruction of the boiler room and installation of a new steam boiler, production of 6 t/h steam plant control system
Reconstruction of the steam boiler room, introducing gas instead of heating oil as an environmentally more acceptable energy source, design and production of a power distribution cabinet in the steam plant.
Production and installation of cabinet and visualization equipment for the steam plant of the laundry room of TURISTHOTEL d.d. in Zadar
Gasification and reconstruction of the hot-water boiler room with 11 MW total power, design and construction of power distribution cabinets for boiler room control. Changing the energy source, transition from heating oil...
Gasification and reconstruction of the boiler room in Samobor
Installation of PLC devices for automatic control of the gas reducing and metering station (GRMS) of the Jertovec combined-cycle power plant (CCPP), implementation of the technical...
Overhaul of the energy and control equipment in the GRMS of the Jertovec CCPP
Increasing energy efficiency, saving on energy consumption, annual savings on heating and hot water preparation costs, reduction of CO2 emissions.
Works on boiler room reconstruction, installation of hot-water boilers with 2.5 MW total power and related equipment, installation of 50 solar panels for domestic hot water preparation.
Works on boiler room reconstruction, installation of hot-water boilers with 1 MW total power, installation of high-temperature heat pumps and related equipment, installation of 120 solar panels for domestic hot water preparation.
Works on reconstruction of the cooling system, installation of a water cooler with 2 x 600 kW total power and changing the main manifold with related equipment and transport pumps.
Installation of a 500-kW boiler that can burn woodchips or pellets, construction of a biomass storage facility and other equipment necessary for boiler room operation. Installation of a calorimeter for monitoring..